Two day epoxy floor install
Why one day epoxy fails, and what the day between the coats is for.
A two day epoxy floor install is the only kind we do. This page is what happens on each of the two days, and what the day between them is for.
The job, start to finish
- Day one
- Grind, epoxy base coat, flake
- Then
- The floor holds a full day
- Day two
- Scrape, polyaspartic clear coat
- Work
- 24 hours of work across two days
- Walk on it
- 24 hours after we finish
- Park on it
- After 48 hours
Jayson describes the job in one breath: “We blow it, we grind it with our diamond grinder. We'll grind it all, and then we'll clear it out, we'll vacuum, and then we prep the epoxy, we lay the epoxy down, we put the flake down, we let it hold for 24 hours, we come back, we scrape it, and then we put the clear coat or polyaspartic, and then that's the final.”
Day one
We blow the slab off and grind all of it with the diamond grinder, then vacuum up the dust. Grinding opens the concrete so the epoxy base coat keys into it rather than sitting on top. Then the epoxy goes down, and the flake is broadcast into it while it is wet.
The hold, and why one day epoxy fails
Then we leave. The base coat and the flake hold for a full day before anybody touches the floor again. A one day install skips that, and Jayson holds that skipping it fails the customer, so he will not do a floor in one day.
When a coating fails on a garage floor it usually fails at the bond. Hot tire pickup, where the coating lifts off under a car’s tires, is a bond failure between the coating and the concrete, and thin coatings and weak surface prep are the usual causes. We grind every floor and give the base its day, because both of those are about the bond.
Day two
We come back, scrape off the loose flake and roll on the polyaspartic clear coat. That is the final coat. The whole job is 24 hours of work across two days.
You can walk on the floor 24 hours after we finish and park on it after 48 hours.
Who does the work
The installers who grind your floor on day one are the ones who come back to top coat it, and Jayson is on every job. Every floor gets the same system. In Jayson’s words, “Everything's gonna be premium.” We install right through the Arizona summer, with no season off.
Every coating gets the same two days
The two days are the same on a garage floor, a patio, a driveway, an RV pad, an interior floor, a shop floor or a walkway or sidewalk. If there is an old coating on the slab, epoxy coating removal comes first, and concrete cleaning is a job of its own with no coating after it. The services page has all nine in one list.
Why not do it in one day?
Because the floor needs the hold. The base coat and flake get a full day before the top coat goes on, and a one day install does not give them one.
What happens between day one and day two?
Nothing, on purpose. The epoxy and flake hold for a full day. Then we come back, scrape off the loose flake and roll on the polyaspartic clear coat.
Get your estimate
Tell us where the slab is and roughly how big. We come back with a blend, a system and a price.
Got it.
We have your request and will call you back on the number you gave us to set a time to come out and measure.
While you wait, the flake colors page has every blend we can put down.